Embry-Riddle Completes Construction on Research, Lab Facility

Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer. The university partnered with ikon.5 architects as the project’s lead designer and with Hoar Construction for construction services.

The 35,000-square-foot facility contains specialized laboratory space that can simulate space and atmospheric conditions, the news release reports; it also features a clean room to sterilize equipment for space operations.

“CAT II is a great example of how thoughtful planning and collaboration can bring highly technical spaces to life,” said Erika Charlassier, Hoar Construction project manager. “From advanced laboratories to the sterilization room, every element of this facility was built to support innovation. Our team worked closely with Embry-Riddle to safely navigate complex conditions while maintaining schedule and budget, delivering a space that will help shape the future of aerospace research and education.”

The construction process took into consideration student planes frequently taking off and landing from the nearby Daytona Beach International Airport. Hoar Construction worked with the university to ensure the placement of equipment like cranes, boom pumps, and forklifts never exceeded the height of the building itself to keep airspace clear.

Hoar previously partnered with Embry-Riddle on the construction of a 239,172-square-foot, four-story parking garage including office space on the ground floor.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.

  • Clearing the Air: H2M Busts Common AC/HVAC Myths

    When it comes to keeping school facilities comfortable and energy-efficient, there’s no shortage of heating, ventilation, and air conditioning (HVAC) advice circulating online or from well-intentioned neighbors. There are also many myths surrounding the negative impact AC/HVAC systems can have on school buildings.