Cleveland High School Breaks Ground on Modernization

Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site. The district partnered with Skanska USA for construction services on the project, which has an estimated completion date of summer 2029.

The campus will consist of two wings, four stories each, connected by a skybridge. The north wing will play home to classrooms and labs, and the south wing to community-use, events, and performing-arts spaces, the news release reports. Specific amenities will include a new main entrance, a student health center, a performing arts theater, a black box theater, studios for dance and wrestling, and separate after-hours access for spaces like the theater and gymnasiums.

“For years, the Cleveland community has envisioned a campus that matches the talent, energy and aspirations of its students,” said Dr. Jon Franco, Portland Public Schools’ Senior Chief of Operations. “We are excited to see that vision become a reality and to provide future generations of students with spaces that support learning, creativity and connection.”

Students and staff will relocate to Marshall High School during construction.

The district also partnered with Mahlum Architects and Studio Petretti for the project’s design. Sustainability initiatives include the use of almost 870,000 board feet of mass timber from the Pacific Northwest. It will also make use of Acoustic Dowel Laminated Timber (ADLT) decking, structural steel, low-carbon concrete, and glulam beams and columns, according to the news release.

“Skanska is proud to partner with Portland Public Schools on a project that will serve future generations,” said Trevor Wyckoff, Executive Vice President and General Manager for Skanska USA Building in Oregon and Southwest Washington. “This project brings together innovative design, high-performance building strategies and flexible learning environments to create a campus that supports student success while serving as a valuable community resource for decades to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.