Cleveland High School Breaks Ground on Modernization

Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site. The district partnered with Skanska USA for construction services on the project, which has an estimated completion date of summer 2029.

The campus will consist of two wings, four stories each, connected by a skybridge. The north wing will play home to classrooms and labs, and the south wing to community-use, events, and performing-arts spaces, the news release reports. Specific amenities will include a new main entrance, a student health center, a performing arts theater, a black box theater, studios for dance and wrestling, and separate after-hours access for spaces like the theater and gymnasiums.

“For years, the Cleveland community has envisioned a campus that matches the talent, energy and aspirations of its students,” said Dr. Jon Franco, Portland Public Schools’ Senior Chief of Operations. “We are excited to see that vision become a reality and to provide future generations of students with spaces that support learning, creativity and connection.”

Students and staff will relocate to Marshall High School during construction.

The district also partnered with Mahlum Architects and Studio Petretti for the project’s design. Sustainability initiatives include the use of almost 870,000 board feet of mass timber from the Pacific Northwest. It will also make use of Acoustic Dowel Laminated Timber (ADLT) decking, structural steel, low-carbon concrete, and glulam beams and columns, according to the news release.

“Skanska is proud to partner with Portland Public Schools on a project that will serve future generations,” said Trevor Wyckoff, Executive Vice President and General Manager for Skanska USA Building in Oregon and Southwest Washington. “This project brings together innovative design, high-performance building strategies and flexible learning environments to create a campus that supports student success while serving as a valuable community resource for decades to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • Compton High School

    Compton High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Compton High School has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.