California Middle School Breaks Ground on Major Renovation Project

The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release. The project’s goal is to modernize outdated facilities. The district partnered with Quattrocchi Kwok Architects (QKA) for design, Blach Construction for building services, and Van Pelt Construction Services for program and construction management.

The Multipurpose Building (MPR) will include a raised performance space, meal server, and warming kitchen. The facility’s retractable back wall will open into a new outdoor courtyard, which can play home to student lunches and performances, school events, and community activities, the news release reports.

"We are thrilled to begin construction on these new facilities, a critical investment for our students and staff," said Ana de Arce, HCSD Superintendent. "These modern and adaptable spaces will provide the backbone by which the campus functions, reflecting the district’s dedication to our community’s future. We would like to thank the community for its support of local bond measures that make facilities upgrades a reality, as well as our dedicated project team.”

The new Administration Building, attached to the MPR via a covered walkway, will have administrative offices, a nurse’s station, and a reception area, according to the news release. It will also feature its own courtyard and partial roof terrace for additional flexible outdoor space.

"Alongside HCSD, Blach and Van Pelt, we are honored to contribute to this project that will replace some of the school’s more outdated facilities with contemporary, flexible, and cohesive environments,” said Lyanne Schuster, QKA principal and studio lead. “These new facilities are designed to foster collaboration and gathering, ensuring the long-term success of the Crocker Middle School campus."

The project entails 17,000 square feet of new construction and was funded by Local Bond Measure H. It has an estimated completion date of winter 2027.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • California District Breaks Ground on Major Campus Renovation

    Alameda Unified School District (AUSD) in Alameda, Calif., recently announced that construction has begun on a major campus overhaul for Otis Elementary School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates, Inc., for its design and construction, respectively.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.