California Middle School Breaks Ground on Major Renovation Project

The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release. The project’s goal is to modernize outdated facilities. The district partnered with Quattrocchi Kwok Architects (QKA) for design, Blach Construction for building services, and Van Pelt Construction Services for program and construction management.

The Multipurpose Building (MPR) will include a raised performance space, meal server, and warming kitchen. The facility’s retractable back wall will open into a new outdoor courtyard, which can play home to student lunches and performances, school events, and community activities, the news release reports.

"We are thrilled to begin construction on these new facilities, a critical investment for our students and staff," said Ana de Arce, HCSD Superintendent. "These modern and adaptable spaces will provide the backbone by which the campus functions, reflecting the district’s dedication to our community’s future. We would like to thank the community for its support of local bond measures that make facilities upgrades a reality, as well as our dedicated project team.”

The new Administration Building, attached to the MPR via a covered walkway, will have administrative offices, a nurse’s station, and a reception area, according to the news release. It will also feature its own courtyard and partial roof terrace for additional flexible outdoor space.

"Alongside HCSD, Blach and Van Pelt, we are honored to contribute to this project that will replace some of the school’s more outdated facilities with contemporary, flexible, and cohesive environments,” said Lyanne Schuster, QKA principal and studio lead. “These new facilities are designed to foster collaboration and gathering, ensuring the long-term success of the Crocker Middle School campus."

The project entails 17,000 square feet of new construction and was funded by Local Bond Measure H. It has an estimated completion date of winter 2027.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Auburn University Debuts $224M STEM + Agricultural Sciences Complex

    Auburn University in Auburn, Ala., recently opened its new $224-million STEM + Agricultural Sciences Complex, the largest research construction project in the university’s history, according to university news. The facility measures more than 265,000 square feet and brings six departments from the College of Agriculture and College of Sciences and Mathematics together under one roof.

  • ZeroEyes, Academic Innovators Partner to Provide Safety Solutions

    ZeroEyes, which produces a multi-analytics weapons detection and threat intelligence platform, recently announced a partnership with Academic Innovators, according to a news release.