California District Breaks Ground on Major Campus Renovation

Alameda Unified School District (AUSD) in Alameda, Calif., recently announced that construction has begun on a major campus overhaul for Otis Elementary School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates, Inc., for its design and construction, respectively. Funding comes from the Measure B facilities bond, and construction has an estimated completion date of fall 2028.

The project features 25,000 square feet of new construction composed of a one-story administration and media center building, as well as a two-story classroom building for students in transitional kindergarten (TK), kindergarten, first, fourth, and fifth grade. Renovation work will include modernizing existing facilities for second- and third-grade students to upgrade electrical capacity, install HVAC, and enhance fire alarms.

“Celebrating this milestone alongside our families, students, staff, project team, and neighbors was a proud moment for all of us,” said AUSD Superintendent Pasquale Scuderi. “This project represents a lasting investment in our students and staff, one that will provide them with the vibrant learning environments they deserve for years to come.”

The site modernization also includes an academic quad featuring outdoor learning areas, a student garden, outdoor dining space, and permeable turf. It also includes a fenced-in playground and play area for TK and kindergarten students. Finally, the project encompasses site infrastructure improvements like a roof solar photovoltaic power system, new digital marquee signs, bio-retention basins for stormwater, and updates to perimeter security.

“Our design for this project centers on creating an adaptable, cohesive campus environment that prioritizes student safety and outdoor engagement,” said QKA Principal Joel Williams. “By pairing modern classroom structures with dynamic outdoor gathering spaces, we are crafting a flexible academic campus that will endure as a vital resource for the entire school community.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.