California Middle School Breaks Ground on Major Renovation Project

The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release. The project’s goal is to modernize outdated facilities. The district partnered with Quattrocchi Kwok Architects (QKA) for design, Blach Construction for building services, and Van Pelt Construction Services for program and construction management.

The Multipurpose Building (MPR) will include a raised performance space, meal server, and warming kitchen. The facility’s retractable back wall will open into a new outdoor courtyard, which can play home to student lunches and performances, school events, and community activities, the news release reports.

"We are thrilled to begin construction on these new facilities, a critical investment for our students and staff," said Ana de Arce, HCSD Superintendent. "These modern and adaptable spaces will provide the backbone by which the campus functions, reflecting the district’s dedication to our community’s future. We would like to thank the community for its support of local bond measures that make facilities upgrades a reality, as well as our dedicated project team.”

The new Administration Building, attached to the MPR via a covered walkway, will have administrative offices, a nurse’s station, and a reception area, according to the news release. It will also feature its own courtyard and partial roof terrace for additional flexible outdoor space.

"Alongside HCSD, Blach and Van Pelt, we are honored to contribute to this project that will replace some of the school’s more outdated facilities with contemporary, flexible, and cohesive environments,” said Lyanne Schuster, QKA principal and studio lead. “These new facilities are designed to foster collaboration and gathering, ensuring the long-term success of the Crocker Middle School campus."

The project entails 17,000 square feet of new construction and was funded by Local Bond Measure H. It has an estimated completion date of winter 2027.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Georgia State University Opens New Research Tower

    Georgia State University in Atlanta, Ga., recently held a ribbon-cutting ceremony for a new, nine-story, 155,000-square-foot Research Tower, according to university news. Amenities include academic classrooms, a large lecture space, teaching labs, faculty research space, and the uppermost floors reserved for future expansion.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.