California Middle School Breaks Ground on Major Renovation Project

The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release. The project’s goal is to modernize outdated facilities. The district partnered with Quattrocchi Kwok Architects (QKA) for design, Blach Construction for building services, and Van Pelt Construction Services for program and construction management.

The Multipurpose Building (MPR) will include a raised performance space, meal server, and warming kitchen. The facility’s retractable back wall will open into a new outdoor courtyard, which can play home to student lunches and performances, school events, and community activities, the news release reports.

"We are thrilled to begin construction on these new facilities, a critical investment for our students and staff," said Ana de Arce, HCSD Superintendent. "These modern and adaptable spaces will provide the backbone by which the campus functions, reflecting the district’s dedication to our community’s future. We would like to thank the community for its support of local bond measures that make facilities upgrades a reality, as well as our dedicated project team.”

The new Administration Building, attached to the MPR via a covered walkway, will have administrative offices, a nurse’s station, and a reception area, according to the news release. It will also feature its own courtyard and partial roof terrace for additional flexible outdoor space.

"Alongside HCSD, Blach and Van Pelt, we are honored to contribute to this project that will replace some of the school’s more outdated facilities with contemporary, flexible, and cohesive environments,” said Lyanne Schuster, QKA principal and studio lead. “These new facilities are designed to foster collaboration and gathering, ensuring the long-term success of the Crocker Middle School campus."

The project entails 17,000 square feet of new construction and was funded by Local Bond Measure H. It has an estimated completion date of winter 2027.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Health & Science Building

    Health & Science Building

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The College of Western Idaho's Health & Science Building has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.