URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank. The new facility is part of a larger, $300-million, multiphase revitalization project for the entire campus.

The facility measures 32,000 square feet, and construction started in March 2024. Major building features include a two-story, high-bay staging area; a test tank measuring 20 feet wide, 30 feet long, and 15 feet deep; eight faculty research labs on the first floor; eight secondary lab spaces for shared or individual use; two shops with mechanical equipment like milling machines, sanders, band saws, and a lathe; faculty office space; and an incubator suite, according to the university website.

“This is a major milestone in the revitalization of this campus,” said University President Marc Parlange. “This campus is truly a hub for the blue economy in Rhode Island, with education, with research, with training, with extension, and partnerships with industry, as well as state and federal agencies. I am so grateful for the support of our state and federal elected officials and generous donors who make this transformation possible.”

About $145 million in funding came from two bond referenda approved by Rhode Island voters.

“The people who will work in the Ocean Robotics Laboratory are building the robots and instruments that are needed to solve challenges by giving them shared space, innovative infrastructure, and place-based partnership opportunity,” said Steve D'Hondt, the Graduate School of Oceanography’s interim dean. “The facility will enable Rhode Island to take a commanding global lead in robotic ocean exploration and automated sensing of the ocean.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Health & Science Building

    Health & Science Building

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The College of Western Idaho's Health & Science Building has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.