How Inflation, Experience Gaps, and AI Are Reshaping Education Construction and Cost Control

Scott Creekmore, VP of Customer Engagement at Gordian, explains how Gordian evolved from Job Order Contracting into planning tools for facility condition assessments and asset recapture, plus estimating through RSMeans price data. He outlines major challenges facing education construction today: rapid inflation driven by geopolitics, an industry-wide experience gap as seasoned professionals retire without enough backfill, and resulting cost-control volatility where prices swing dramatically over short periods. Creekmore describes how advancing technology—especially AI—along with CMMS and cost-tracking software can help agencies do more with less by improving scope detail, reducing change orders, tracking labor on site, and enhancing cost benchmarking and predictive insights, including regional price differences. He also advocates for longer-term planning, economies of scale, and reexamining procurement laws and options such as cooperative purchasing and job order contracting to improve cost control.

00:00 Meet Scott and Gordian
00:22 Gordian Origins and Services
01:14 Industry Challenges Today
03:14 Tech Trends and AI Tools
05:11 AI for Better Scopes
07:42 Long Term Planning in Education
09:22 Smarter Procurement and Cost Control
10:05 Closing Thoughts

Additional resources:

Sponsored by Gordian

Featured

  • William Penn Charter School

    Richard A. Balderston OPC’69 Lower School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Richard A. Balderston OPC’69 Lower School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • Big Horn Academy

    Big Horn Academy

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Big Horn Academy has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.