How Inflation, Experience Gaps, and AI Are Reshaping Education Construction and Cost Control

Scott Creekmore, VP of Customer Engagement at Gordian, explains how Gordian evolved from Job Order Contracting into planning tools for facility condition assessments and asset recapture, plus estimating through RSMeans price data. He outlines major challenges facing education construction today: rapid inflation driven by geopolitics, an industry-wide experience gap as seasoned professionals retire without enough backfill, and resulting cost-control volatility where prices swing dramatically over short periods. Creekmore describes how advancing technology—especially AI—along with CMMS and cost-tracking software can help agencies do more with less by improving scope detail, reducing change orders, tracking labor on site, and enhancing cost benchmarking and predictive insights, including regional price differences. He also advocates for longer-term planning, economies of scale, and reexamining procurement laws and options such as cooperative purchasing and job order contracting to improve cost control.

00:00 Meet Scott and Gordian
00:22 Gordian Origins and Services
01:14 Industry Challenges Today
03:14 Tech Trends and AI Tools
05:11 AI for Better Scopes
07:42 Long Term Planning in Education
09:22 Smarter Procurement and Cost Control
10:05 Closing Thoughts

Additional resources:

Sponsored by Gordian

Featured

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.