LACCD Holds Groundbreaking for $40M Student Services Building

The Los Angeles Community College District (LACCD) held a groundbreaking ceremony last week for the new $40-million student services building at Los Angeles Mission College. The event, which was livestreamed on YouTube and Facebook on Thursday, April 15, was the first in-person event for LACCD since the beginning of the coronavirus pandemic.

Attendees included members of the LACCD Board of Trustees, the Chancellor, the Los Angeles Mission College community, and other district officials. Featured speakers included LACCD Board President Steven F. Veres, LACCD Chancellor Francisco C. Rodriguez, Ph.D., and Mission College President Monte E. Perez.

The new Student Services & Administration Building will consist of three stories and cover 59,000 square feet. It will house student services like admissions, financial aid, and other administrative offices. The building was designed and placed to serve as a gateway to the campus, both physically and metaphorically. It will follow LEED Gold technology standards and include sustainability efforts like drought-tolerant landscaping, green-roof technology to minimize use of HVAC systems, and 66 kWh of solar panels.

Los Angeles Mission College is one of nine schools included in the LACCD system. The construction is part of the district’s “BuildLACCD” initiative, a $9.6 billion capital improvement plan that has seen more than 700 projects completed to date. The Student Services & Administration Building is also the first project of the initiative to be funded entirely from the $3.3 billion in “Measure CC” bond funds that voters approved in 2016.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

  • Wisconsin District Launches Series of Improvement Projects

    The School District of River Falls in River Falls, Wis., recently launched a series of five construction projects scheduled for completion by September 2025, according to a news release. The district partnered with Bray Architects for their design and with integrated construction management firm Kraus-Anderson (KA) for their construction.

Digital Edition