Voltek Featured on “The Build Show” Video Series

Low voltage power solutions company Voltek Systems Inc. was featured in a recent episode of the popular home remodeling YouTube series "The Build Show." Host Matt Risinger, a contractor who specializes in architect-driven and fine craftmanship work, discussed the installation of low-voltage wired and powered USB outlets that can power devices like smartphones and laptops without the use of a bulky charging brick. The outlets provide input ports for both USB-A and USB-C cables.

A centrally mounted Voltek Rack Mount Power Supply unit converts 110-volt power into DC, which is distributed up to 1,000 feet through a low voltage cable to each outlet. One unit can provide power for up to 12 USB outlets installed throughout a facility. Outlets wired to the central rack mount can be placed anywhere in a building for easy charging capabilities without excess equipment. The rack-mounted power supply unit can also be attached to a battery backup to run for hours in the event of a power outage.

Wall-mounted USB outlets have grown in popularity in spaces like huddle areas, classrooms, study rooms, residence halls, and offices, as they offer the ability to charge a device conveniently and discreetly.

Voltek’s primary focus has been on the K–12 and Higher Education spaces, where laptops have become the norm for the teaching environment.  Nearly every model of laptop now charges over a USB-C connection, and the Voltek system provides the ability to charge these without the need for the AC-to-DC conversion brick. Voltek also aims to keep the laptop charging while the device is in use, as opposed to the student having to dock it on a charge cart and remove it from the learning environment during the interim.

Installation of Voltek outlets doesn’t require a licensed electrician, and they can easily be deployed as a retrofit in learning environments lacking electrical outlets. Additionally, they offer a significant cost savings over traditional 110 AC outlets when installed in a new construction project. Providing only low voltage power at the outlet, they are also safer due to no risk of electrical shock.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • DLR Group Hires Three for Higher Education Practice

    Integrated design firm DLR Group recently announced that it has brought three new hires on board to help shape its higher education practice in California and the northeast, according to a press release.

  • Growing Allied Health Workforce Demands Fueling Greater Need for Higher Education Facilities

    With the demand for healthcare professionals at an all-time high, colleges and universities are challenged with supporting the workforce demands in their own communities. Careers in allied health generally require specific training and/or certification, with some positions requiring degrees, certified credentials, and continuing education.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.