California College Breaks Ground on Creative Arts Facility

College of the Redwoods, a community college in Eureka, Calif., recently broke ground on a new creative arts building. Staff and administration gathered on Thursday, Jan. 27, to mark the beginning of construction. The new facility will measure in at 29,888 square feet and will replace the former creative arts building, which was built in 1974. The project is expected to be complete by July 2023, according to local news.

“This is a wonderful opportunity to honor our faculty and our administration—and the fact that we are going to do a great service to our students by having a state-of-the-art creative arts building in one year,” said College of the Redwoods President Keith Flamer. “A year and a half from now, we will invite you back for the grand opening of a brand-new building.”

The project is expected to cost about $28 million, and the full measure of funds will come from the state via Proposition 51. Local news reports that voters passed Proposition 51 in 2016 to allow the state to allocate up to $3 billion in bonds for new educational facilities. Another major factor in the new building’s construction is that the current creative arts facility sits on a fault line.

The new construction will include energy-efficient features like radiant heat flooring, irrigation with reclaimed rainwater, solar hot water heating and an outdoor performing arts stage. The building will also be placed in a more central location closer to the campus’s performing arts center. The building’s photography lab will also see significant upgrades to its digital and video capabilities.

“We’ll have state-of-the-art equipment, and so our faculty will have upgraded technology to take advantage of what’s going on with education now,” Flamer added. “But also, the fact that our gallery will be more modern, so the whole building will be easier for us to access. We’ll be able to move to the center of the campus. This way, our students won’t have to trek from one end to campus to the other just to access their classroom.”

The college is partnering with tBP/Architecture on the project.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Texas A&M Breaks Ground on Campus Visitor Center

    Texas A&M University in College Station, Texas, recently held a groundbreaking ceremony for a new campus learning hub and visitor center, according to a news release. The 211,000-square-foot Aplin Center will stand three stories and is scheduled to open to students in 2028.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.