Greenheck Introduces AER Configurable Condenser Fan

Greenheck, a national supplier of air movement, air control, and air conditioning equipment, recently introduced its new AER direct drive configurable condenser fan, according to a press release. The unit offers temperature regulation and can provide ventilation for pre-existing equipment, including situations that require enhanced water and temperature protection.

The unit comes in four sizes ranging from 20 to 36 inches. It also provides a performance of up to 29,800 cfm and an external static pressure of up to 2.80 in. wg, the news release reports. According to the product description on the Greenheck website, “The configurable condenser model AER is designed for clean-air applications including tempered air systems, dedicated outdoor air systems (DOAS), mission-critical, and data-center management. Motor protection available up to IP55 and can operate up to 60°C [140°F] ambient temperature. Fan features galvanized steel construction, fabricated steel or cast aluminum propellors, and alternating-current (AC) or electronically commutated (EC) motor options.”

The news release also reports that the product is AMCA-certified for Sound and Air Performance, as well as UL/cUL 705 Listed.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.