Clemson University to Renovate Auditorium

Local news reports that the Board of Trustees at Clemson University in Clemson, S.C., recently approved renovations to Tillman Hall Auditorium which will begin later this year.

University spokesperson Joe Galbraith said that no work has been done on the building in more than 40 years. “Classroom space is at a premium all around campus and certainly the opportunity to have a large auditorium-style classroom that we can use throughout the year is an important piece—but also, this building hasn’t been renovated since 1981,” he said. “So the opportunity to really update some of the infrastructure and this space and make it more usable for a variety of events, it’s time.”

Renovations will include repositioning the space, adding natural light, new HVAC and lighting, new seating, and upgrades to the auditorium’s infrastructure, according to local news.

“Beginning this September, this entire auditorium will be—in some ways—resorted back to one of its early forms, as well as upgraded to serve as more of a multipurpose area for consistent use as a classroom and as an auditorium,” said Galbraith.

Construction is set to begin this fall, and the project will cost an estimated $11.5 million, according to local news station WYFF.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).