REMEDI8 Spotlights Dust Control Mobile Containment Unit

Fire protection and compliance solutions provider REMEDI8 recently spotlighted one of its dust containment units for use in construction and other heavy-debris environments, according to a news release. The DUST-10C was designed for control, efficiency, easy cleaning and maintenance, and durability. The unit also comes pre-assembled to reduce installation costs.

The unit can rise to 10 feet high and comes with a 6-foot, fully extendable ladder for use with taller ceilings. The One-Step Lift and Lock mechanism allows a single worker to move the unit within a facility and set it up within 30 seconds, the news release reports. The unit also offers convertibility for HEPA filtrations, allowing contractors and maintenance workers the ability to fit a dust mitigation unit with a HEPA air filtration system.

The DUST-10C Mobile Containment Unit allows for seamless integration into building environments with its flexible applications and easy cleanability. REMEDI8 also offers compliance coverage to its customers in all 50 U.S. states.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • nursing students talk while studying in a hallway

    Elsevier Launches VR Simulation Solution for Nursing Students

    Elsevier has introduced Shadow Health Lab with Virtual Reality, a simulation platform that allows nursing students to interact with virtual patients and build clinical judgment skills in a safe, realistic environment.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.