Schools In Focus: PCM and Energy Savings in Schools

Schools In Focus is a podcast dedicated to the design, planning and management of educational facilities and campuses. Listen in as we chat with industry experts, facility managers, architects, security and safety professionals, and other thought leaders. Catch up on previous episodes here.

This episode’s guest is Michael Dunn, Technical Sales Manager for Energy Saving Ceilings & PCM at Armstrong World Industries. He’s here to talk about how Phase Change Material (PCM) can help provide energy savings in schools. You’ll learn why many K¬–12 schools are on the hunt for a new HVAC solution and the practical applications of PCM ceiling panels in regulating temperature without driving up energy costs. He’ll also share the results of the case study at a New Hampshire high school that demonstrated the technology’s effectiveness. This episode is sponsored by Armstrong World Industries.

Schools In Focus, Episode 37: PCM and Energy Savings in Schools

 

Where to Listen

Schools In Focus is available on Apple Podcasts, Spotify, Google Podcasts, and Amazon Music. Subscribe today, or listen below!

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.