East Carolina University Selects Architect for $60M Residence Hall Renovations

East Carolina University in Greenville, N.C., recently announced that it has selected the KWK/Jenkins Peer Architects (JPA) team, collaborating with INTREPID Architecture, to design renovations for two of its residence halls, according to a news release. The goal of the $60-million project is to offer more modern amenities, accessibility, and a better use of space for Jones Hall (built in 1958) and Legacy Hall (built in 1960).

The news release reports that Jones Hall has room for about 430 students and houses the university’s Campus Living offices. Legacy Hall has room for about 470 students and is the only residence hall on campus that is not ADA-compliant. Construction on Legacy Hall will begin in May 2025 and finish by July 2026. Construction on Jones Hall has an expected start date of May 2026 and completion date of July 2027.

Legacy Hall exterior
Image Courtesy of KWK Architects

The work includes replacing mechanical, electrical, and plumbing systems in both halls; updating windows and roofs; installing private facilities in hall bathrooms; creating an ADA-compliant, ground-floor entrance to Legacy Hall; adding public lounge space and an elevator to Legacy Hall; and building the green space around both halls.

“The Legacy work will include the addition of a two-story mezzanine room to reinforce a contemporary sense of place and provide a welcoming space for students, in addition to incorporating access to a new elevator for all floors,” said Javier Esteban, KWK Architects Principal. “The renovation of both halls will also include updated, individual bathrooms that allow complete privacy for the students, and at the same time far exceeds ADA requirements.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Elevating Campus Maintenance: How Power Wash Drones are Transforming Educational Facilities

    As today’s campuses grow larger and more architecturally complex, keeping exteriors clean, safe, and inviting has never been tougher. Facilities leaders are under constant pressure to stretch budgets, meet safety standards, and support sustainability goals—all while tackling the stubborn challenge of exterior cleaning.

Digital Edition