East Carolina University Selects Architect for $60M Residence Hall Renovations

East Carolina University in Greenville, N.C., recently announced that it has selected the KWK/Jenkins Peer Architects (JPA) team, collaborating with INTREPID Architecture, to design renovations for two of its residence halls, according to a news release. The goal of the $60-million project is to offer more modern amenities, accessibility, and a better use of space for Jones Hall (built in 1958) and Legacy Hall (built in 1960).

The news release reports that Jones Hall has room for about 430 students and houses the university’s Campus Living offices. Legacy Hall has room for about 470 students and is the only residence hall on campus that is not ADA-compliant. Construction on Legacy Hall will begin in May 2025 and finish by July 2026. Construction on Jones Hall has an expected start date of May 2026 and completion date of July 2027.

Legacy Hall exterior
Image Courtesy of KWK Architects

The work includes replacing mechanical, electrical, and plumbing systems in both halls; updating windows and roofs; installing private facilities in hall bathrooms; creating an ADA-compliant, ground-floor entrance to Legacy Hall; adding public lounge space and an elevator to Legacy Hall; and building the green space around both halls.

“The Legacy work will include the addition of a two-story mezzanine room to reinforce a contemporary sense of place and provide a welcoming space for students, in addition to incorporating access to a new elevator for all floors,” said Javier Esteban, KWK Architects Principal. “The renovation of both halls will also include updated, individual bathrooms that allow complete privacy for the students, and at the same time far exceeds ADA requirements.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition