Tennessee District Opens New Central Office

The Franklin Special District (FSD) in Franklin, Tenn., recently held a ribbon-cutting ceremony for its new 38,400-square-foot Central Office facility, according to a news release. The district partnered with Wold Architects and Engineers to create an administrative space designed to boost productivity, collaboration, and employee wellness. The two-story building will unite most district personnel beneath one roof.

The space will include amenities like a 2,800-square-foot assembly space with AV technology, a wellness area, an open-air courtyard, and loading and storage spaces. The project also included renovating an existing building into the 12,400-square-foot FSD Facilities and Transportation Center. The space features administrative offices, a meeting area, drivers’ lounge, maintenance space and equipment, and storage space.

“At Wold, our ultimate mission is to support the communities in which we live, work and play, and we could not be more grateful for our ongoing partnership with Franklin Special District that allows us to design spaces that bring this vision to life,” said Wold Architects & Engineers Principal Steve Griffin. “This new office blends modern functionality with timeless design, creating a space that not only enhances efficiency and collaboration but also reflects Franklin’s rich architectural heritage. Seeing this project complete is incredibly rewarding, and we’re proud to support a district that values innovation, community and staff well-being.”

FSD also partnered with Nabholz for construction management services, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.