Balancing Historic Architecture, Sustainablity and Modern Amenities

Elmhurst Community Unit School District 205, in Elmhurst, IL, welcomed the public to tour the newly renovated and expanded Hawthorne Elementary School. A special dedication to celebrate the completion of the school’s $16M makeover was held in September.

The building project included a two-story, 12-classroom addition (20,000 sq. ft.) and another 58,000 sq. ft. of renovations to the 90-year-old Hawthorne grade school. Its purpose was not only to provide more space for growing enrollment but also to modernize the teaching environment.

A notable design feature of the project was the preservation of the original historic façade within the two-story atrium between the existing building and the new addition. The changes to the building also incorporated sustainable design strategies such as permeable parking lot pavers, water-saving plumbing fixtures, and high efficiency lighting and mechanical systems.

Other project highlights included:
  • remodeling of existing classrooms with new ventilation systems, power and lighting systems, technology systems, finishes, and casework;
  • making improvements to the building envelope, including exterior window replacement, masonry restoration, and tuck pointing;
  • replacing all major mechanical systems with high-efficiency, energy-saving systems controlled by building automation;
  • remodeling art and music classrooms; and
  • providing abundant natural light through the use of window transoms and a large central skylight.
“Our challenge was to create a modern facility while maintaining the historical integrity and character of the oldest grade school in the District,” said Kevin Havens, Senior. Vice President and Director of Design, of Wight & Company.

The Elhurst district currently services more than 7,800 students who reside primarily in the city of Elmhurst and small portions of Oak Brook, Bensenville, and Addison. At present, District 205 maintains 13 schools (eight elementary schools, three middle schools, York Community High School, and an early childhood center).

The renovation and construction was managed by Wight & Company. For more information, visit www.wightco.com.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition