Energy Saving Retrofit

Energy Saving Retrofit 

Before and after the retrofit.

Energy savings have long been important at Regis High School, a tuition-free Jesuit college preparatory school for young men in New York. This drove school leadership to choose Seesmart Technologies, Inc. when it came time to retrofit more than 2,500 fluorescent lights throughout the school.

Regis’ estimated LED retrofit benefits include significant energy savings of more than $36,000 and over 116,000 kilowatt-hours per year with a carbon footprint reduction of almost 120,000 pounds per year. Additionally, the preparatory school received a $32,000 rebate from Con Edison.

“Here at Regis, we pride ourselves in fostering a spirit of generosity and service, so decreasing our carbon footprint was an obvious decision for the betterment of our neighborhood,” says Father Judge, president of Regis High School. “This project was a big step toward setting a good example for our students and the community as it solidifies our commitment to a more sustainable future.

Seesmart’s retrofit for Regis High School began by replacing the light fixtures in the gymnasium with LED fixtures. After seeing the results in the gym the administration decided to replace all of the school’s lighting with LED fixtures. Fluorescent lights were replaced with Seesmart LED tube lighting in over 100 classrooms, offices, and other educational spaces, as well as extensive hallways. The changeover included 967 new or retrofitted fixtures.

Father Judge says, “Since 2006, Regis has been an educational leader in ‘going green’ which can be seen by our 22 kilowatt solar panel array on the roof, a 22,000 square-foot green roof installation, as well as other sustainable efforts. Committing to an entirely LED facility with the help of Seesmart was the next step in our efforts to further decrease our carbon footprint.”

www.seesmartled.com

This article originally appeared in the issue of .

Featured

  • Illinois State University Breaks Ground on College of Fine Arts Transformation

    Illinois State University in Normal, Ill., recently held a groundbreaking ceremony for the Wonsook Kim College of Fine Arts transformation project, according to university news. The series of new constructions and renovations will upgrade spaces in Centennial East, the Center for the Visual Arts, and the Center for the Performing Arts, as well as replace the existing Centennial West facility with a new Commons Building.

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.