University of Scranton

Loyola Science Center

Scranton University 

EXTERIOR PHOTOS © ROBERT BENSON PHOTOGRAPHY
INTERIOR PHOTOS © BARRY HALKIN PHOTOGRAPHY

The EYP-designed Loyola Science Center at Pennsylvania’s University of Scranton redefines the traditional boundaries of STEM learning and research spaces by enhancing communication and collaboration and by promoting science learning in informal environments and social contexts. A place for intellectual engagement among all members of the community, it makes science accessible and welcome to all, thereby revealing science as a human endeavor. The facility functions well as a showcase for the excitement of modern science pedagogy. The integration of joining the new construction on the edge of university property directly to the central campus pedestrian walkway is the major element in drawing science education from the figurative “periphery” to the central and most active area of the campus.

EYP’s design makes extensive use of high-efficiency glazing to reduce energy use, enhance visibility and views, and put science on display. The dynamic, modern design includes inviting spaces for student/faculty collaboration, visible glass-walled laboratories and the efficiencies of using shared instrumentation. Designed for LEED Gold certification, the Center includes 165,000 gross square feet of new construction seamlessly integrated into 76,900 gross square feet of renovated space. It contains 22 class and seminar rooms, 34 teaching and research laboratories and 80 faculty offices, and informal gathering spaces are incorporated in a variety of ways, including wide corridors and display structures.

Built on the ideas of Project Kaleidoscope, a program spearheaded by the National Science Foundation whose goal is to boost the quality of teaching and learning in the sciences, the Center’s layout provides a physical space that encourages integration among the traditional science, technology, engineering and mathematics programs, as well as the humanities, to drive the development of new teaching methods and engage students in practices that will prepare them for future challenges.

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.