Refinishing Floors

Floor RefinishingThe summer months are the busiest time of the year when it comes to refinishing floors, especially for educational facilities. But as anyone that has ever refinished floors knows, the job can be long and arduous.

One of the most difficult and time-consuming steps in refinishing floors is ensuring that all the finish and soil buildup along the edges of the floor, in corners and in hard-to-reach areas is removed. But it is a job that must be performed in order for the floors to have a clean, even shine.

Because this particular step is so necessary and so difficult, following is information on the different ways to strip edges and corners clean. Refinishing pros recommend the following techniques:

  • Scrub the edges using a scrubbing pad or razor scrape and chemical stripper. Wear gloves and goggles, make sure the area is well ventilated and properly dilute the stripper before use. Allow for proper dwell time, then thoroughly rinse all surfaces clean.
  • Use a “paddle stick” with a scrub pad along edges and in corners to agitate the stripper and loosen the finish and soils, then rinse clean.
  • If using a rotary buffer, apply more pressure to edges by pushing down on one side of the handle and pulling up on the other while carefully maneuvering the machine as it moves along the edge. This technique can be effective, but requires considerable skill and experience to perform correctly.
  • Use an “orbital” floor machine; these systems have a rectangular design, so they can fit comfortably into edges and corners. Walk the machine slowly along the edge for thorough cleaning and agitation. Some systems have optional weights that can increase downward pressure for more effective edging.

“When it comes to floorcare, it’s the details that make the difference,” says Debby Davis, product manager for Powr-Flite and a floorcare expert. “Ensuring the edges and corners are properly stripped, cleaned and finished is the difference between a good job and a bad job.”

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.