Polished Floors, Right on Schedule

Students and faculty at the Southridge Elementary School in Casper, Wyoming were a bit shocked when they were informed that their brand new school would not be ready for the August 19 start of the school year. Many construction delays were encountered during the project, including the polished concrete floors in the school that were deemed unacceptable by the architect.

The building was 100-percent complete when the decision was made to completely repolish the entire school. Cove base was in place, walls were painted, carpet was laid and cabinets were set. The building was virtually ready to be occupied when the decision was made. A well-known concrete consulting company was hired to assess the situation. Their 20-page report indicated that the floor did not meet the standards of the specification and should be repolished and dyed to the architect’s specification.

Freddie Gwynn, owner of Polished Concrete of Wyoming sat down with the contracting superintendent of the project and discussed the potential remedy. “It’s not going to be cheap, but it will be right” Freddie told him. A rigid timetable to complete the work was laid out. In order to pull this off, Freddie brought in another highly qualified FGS Permashine Contractor, Shawn Weaver of Concrete Floor Systems based in Denver, Colorado.

Plastic was put into place floor to ceiling in order to minimize dust contamination and damaging the finished painted walls. The edging was perhaps the biggest task to tackle. Crews spent countless hours hand grinding and polishing right up to in place carpeting.

Care was taken to densify to complete rejection to ensure that the dye was properly locked in. Final polishing and further densification brought the entire building up to the specified 1500-grit level. What does the school think? “We are very pleased with our floors and with the two contractors,” exclaims Principal Rick Skatula.

This article originally appeared in the issue of .

Featured

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.