CHPS Releases Fourth Edition of CA-CHPS Criteria

The Collaborative for High Performance Schools (CHPS) released the fourth edition of the California CHPS Criteria (CA-CHPS) on Aug. 25, 2014. According to Chester Widom, California State Architect and CA-CHPS Advisory Committee co-chair, "The improvements in the 2014 edition of the CHPS Criteria will have a positive impact on the environment and specifically on the sustainability of schools in California."

Schools designed according to CA-CHPS Criteria emphasize indoor air quality, natural lighting and excellent acoustics in order to maximize student health, comfort and achievement. Aaron Jobson, co-chair of CHPS' California Advisory Committee says that, "numerous studies have been conducted on the impact of school facilities on children's health and productivity, and the results are unequivocal. From ventilation to natural light to the use of nontoxic chemicals, how we design and operate our schools has a tremendous impact on our kids."

He adds that this new version of CA-CHPS incorporates the latest thinking of architects, engineers and state agencies on how best to construct the next generation of schools that are healthy, energy-efficient and environmentally friendly.

According to the CHPS news release concerning this new version, there are a number of key advances:

  • It establishes indoor environmental quality as the top priority;
  • It embraces design toward zero net energy;
  • It adds an Operations & Metrics category to ensure actual performance of high-performance schools and the continued realization of benefits over time;
  • It streamlines the CHPS Verified documentation process through the adoption of a plansheet approach;
  • It offers the High Performance Transition Plan as a pathway for incremental improvement and recognition for schools that undertake a series of renovation/modernization projects. (This is an extremely important element because with the passage of Proposition 39 — $2.5 billion will be spent over the next five years on energy efficiency retrofits of existing California schools.)
  • New California-specific credits include a District Sustainability Plan, Active Energy Management for Energy Efficiency, School Farm, Rainwater Catchment, and Electric Vehicle Charging station.

"The importance of this new CA-CHPS Criteria cannot be overstated," says Jessica Mack, CHPS Vice Chair, and Demand Side Management Manager at Southern California Edison. "By integrating the Title 24 Energy Standards and CALGreen, this new CA-CHPS version provides a clear path forward for school districts interested in offering the highest quality learning environment."

The 2014 CA-CHPS Criteria can be downloaded at www.chps.net/dev/Drupal/node/32.

Featured

  • Wold Architects & Engineers Announces Acquisition of JJCA

    Wold Architects & Engineers, based in Minneapolis, Minn., recently announced that it has acquired JJCA, an architecture firm based in Nashville, Tenn., according to a press release. JJCA specializes in healthcare and education design; the partnership allows both firms to expand their presence across the country while building on existing strengths.

  • Fargo, N.D., Starts Construction on Consolidated Elementary School

    Fargo Public Schools in Fargo, N.D., recently announced the beginning of construction on a new elementary school, according to a news release. The district partnered with ICON Architectural Group and Kraus-Anderson Construction on the new Horace Mann Elementary School.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.