Collaboration, Furniture Make the Difference

SMARTdesks

The Carlyle Computer Lab At Don Bosco Cristo Rey High School benefitted greatly from design help and through the use of innovative furniture from SMARTdesks.

Following a dedication and blessing, the Carlyle Computer Lab opened its doors at Don Bosco Cristo Rey (DBCR) High School and Corporate Work Study Program of Takoma Park, Md. Furniture manufacturer SMARTdesks upgraded DBCR’s “old school” facility, making it a state-of-the-art college prep computer lab by providing an engineered, custom designed collaborative learning environment.

The design process began with an SMARTdesks online design request, and a vision by its President, Father Steve Shafran, to enrich students’ writing and critical thinking capabilities, with mastery of technology and digital resources — skill sets essential in college and today’s workplace.

SMARTdesks Director of Design Michele McHenry and President Jeffrey Korber collaborated by phone and computer with Father Steve over the course of the project, addressing issues from computer size to spacing of the power management outlets and monitor placement. When the required number of students in the new computer center grew from 28 to 30, a linear desk layout provided the answer to meet capacity effectively.

As Korber acknowledges, “The buildings that we use today generally do not fit the collaborative mode or the layout that includes wiring, moveable power and flexibility. And the key word here is flexibility, because when I look at space, it’s pretty much fixed. So, one of the things that is really important is: how do you take fixed space and make it flexible?”

The key to flexibility is to incorporate technology into the educational space. Korber says, “The speed of access to information has increased at exponential rates in the last 20 years, and that drives the need for the interior environment that gives the end-user access to equipment. But at the same time, it presents architectural challenges.” SMARTdesks Furniture + Furniture Integration Technology proved to be the best solution for the challenge.

www.smartdesks.com

This article originally appeared in the issue of .

Featured

  • Wold Architects & Engineers Announces Acquisition of JJCA

    Wold Architects & Engineers, based in Minneapolis, Minn., recently announced that it has acquired JJCA, an architecture firm based in Nashville, Tenn., according to a press release. JJCA specializes in healthcare and education design; the partnership allows both firms to expand their presence across the country while building on existing strengths.

  • Fargo, N.D., Starts Construction on Consolidated Elementary School

    Fargo Public Schools in Fargo, N.D., recently announced the beginning of construction on a new elementary school, according to a news release. The district partnered with ICON Architectural Group and Kraus-Anderson Construction on the new Horace Mann Elementary School.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.