University of Western Ontario

Project Snapshot

PROJECT: Paul Davenport Theater
INSTITUTION: University of Western Ontario
LOCATION: London, ON, Canada
COMPANY NAME: Wenger
WEBSITE: www.wengercorp.com

THE CHALLENGE

The University of Western Ontario (UWO) offers 400 specializations, majors and minors to 36,000-plus students. When planning the renovation of UWO’s Talbot Theatre, faculty goals included better sound for a range of performances and sound levels that were less overpowering.

University of Western Ontario

University of Western Ontario

UWO selected a full-stage acoustical shell as a key element of a theatre renovation designed to improve acoustics.

THE SOLUTION

Additional cubic volume was needed to improve reverberance, so UWO enlarged the space by demolishing a floor of classrooms above the theatre. This raised the ceiling and increased the room’s volume by 33 percent. As part of this renovation, a Diva® full-stage acoustical shell was installed; its towers and ceiling panels were manufactured to satisfy specific acoustical requirements.

The shell’s design accounted for the shallow stage depth, which squeezed the available space for freestanding acoustical towers. The three rear towers were attached to the stage’s back wall, with three movable towers on each side.

The ceiling panels, or clouds, consist of four rows of five panels each. Openings between the panels allow some sound to escape, and the ability to fine-tune each panel’s angle is another advantage. Operationally, two primary shell setups are used regularly: the full shell for large ensembles, or six towers arranged in an arc — using half the clouds — for smaller concerts or recitals. A four- to five-person crew can set up the shell from its storage position and then strike it back into its storage position in approximately four hours. With the patented, electric-powered Air Transporter, one person can easily move a 1,350-pound tower.

Visually, this Diva shell complements the aesthetics of the renovated auditorium, which was renamed the Paul Davenport Theatre. Birchwood is featured on many auditorium finishes, including the proscenium arch and Diva shell, which features a warm-looking birch veneer.

IMPACT ON LEARNING

A main goal of the project — for student musicians to fully realize the benefits of their rehearsals — is realized through the use of improved acoustics. In UWO’s larger renovated space, the Diva shell creates a “blending chamber” for sound on stage, improving communication among musicians and their director.

“As a musician performing in the hall, the most important thing is the supportive environment and inspiration that comes with the warmth and presence,” comments Stéphan Sylvestre, assistant professor of piano and Keyboard Division coordinator. “As an audience member, there’s definitely much better clarity and sound projection.”

Editor's Review

For all students, but particularly for music students, the acoustics of their learning spaces matter. Good acoustic design results from careful manipulation of two factors: initial time delay and reverberation time. Reverberation time is related to the volume (size) of the room and the noise absorption of its surfaces. With close attention paid to these factors in the renovation of what is now the Paul Davenport Theater, the result is a much-improved, acoustically ideal space that will allow music professors to teach and students to learn, rehearse and perform at a higher level than before the renovation.

This article originally appeared in the issue of .

Featured

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

Digital Edition