Successfully Furnishing iSTEAM3D Classrooms

iSTEAM3D

Innovative furniture, provided by Smith System, helped propel the ambitious iSTEAM3D curriculum model to success at the Desoto Independent School District.

“JUST PULLING [in] any furniture wouldn’t work,” explains Dr. Jo Green-Rucker with DeSoto Independent School District in DeSoto, Texas. The suburban school district was about to take its STEM initiative a step further with the creation of iSTEAM3D. Its unique curriculum model would combine science, technology, engineering and math with innovative, the arts and 3D learning (discovering, designing and developing).

With the curriculum defined, the district set out to implement an “academy” in each of the district’s three middle schools. Each would have five teachers.

“We wanted the students to use every inch of the academy… in any way they want[ed].” The areas were designed with large open spaces for content, projects and collaboration, a dance room and a science lab. Next up was installing furniture that would allow maximize use of the spaces.

Smith System, a leader in designing furniture for 21st Century classrooms, stepped in to provide tables, lab tables, chairs and storage systems, within the district’s ambitious timeframe.

The versatility of the space and casters on the furniture allow easy transitions from large groups to small. A typical day in the academy, according to West Middle School reading teacher Yvonne Lowry, starts “in the morning [as] students rotate to each teacher to receive content and project instructions. In the afternoons, students have project time with their small groups. The teachers act more as facilitators.”

About one year into launching the academies, all signs point to success. The students are enjoying their new lab stools and tables, “because they are different from the traditional, which is facilitating a new learning process,” says Joey Hayward, East Middle School science teacher. He adds: “The students in iSTEAM are scoring higher than those not in it. We’ve seen tremendous growth in students.”

www.SmithSystem.com

This article originally appeared in the issue of .

Featured

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.