Time to Make Some Facility Changes

If you would like to make some changes to your existing facility to support your early childhood education program but don’t have a lot of money, here are some ideas that might work for you.

  • Install low sinks in a non-carpeted area for children to easily wash their hands and tools (such as paint brushes).
  • Install carpet in the rest of the classroom for sound absorption.
  • If you don’t have windowsills, create shelving under the windows to hold science experiments and growing plants that need light, recommends Peter J. Pizzolongo, associate executive director of Washington-based National Association for the Education of Young Children (NAEYC) (www.naeyc.org).
  • Install bulletin board display rails at the students’ eye level on the wall to display artwork and to prevent ripping paint off the wall when removing tape.
  • Install solidly constructed storage units with doors so that materials not being used (such as glue, paint and glitter) are out of sight and out of reach of small hands.
  • What to do with fluorescent light? Cover the tubes with pink sleeves or installing panels featuring blue sky with white clouds. “This is terrific for classrooms where students have sensory integration delays, ADHD or are hyper sensitive to light,” indicates Barbara Romano, MAEL, principal/early childhood coordinator of Barrington Community Unit School District 220’s Early Learning Center in Illinois.
  • Similarly, install different kinds of lighting at different angles to make classrooms feel cozier.
  • Speaking of cozy, put an adult-sized and a child-sized rocking chair in each classroom.
  • Outfit the entrance to each classroom with cubbies in a U-shape, along with a rug and bench to sit on to take off boots.
  • Paint the walls in subdued earth tones for a calming, neutral environment. Color is added in the form of the students’ artwork displayed throughout the room.

This article originally appeared in the issue of .

Featured

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • RIT Saunders College of Business – Lowenthal Hall Addition

    RIT Saunders College of Business – Lowenthal Hall Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. RIT Saunders College of Business's Lowenthal Hall Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.