SLAM Recognized on Five Teams Receiving the Connecticut Building Congress Project Team Awards

Glastonbury, Conn., – On June 9th, The S/L/A/M Collaborative (SLAM), was recognized for its participation as a design firm on five of the eight CBC Project Team award-winning projects at the 19th annual awards banquet in Hartford. The Connecticut Building Congress looks for outstanding building projects that exemplify project team excellence and represent the best practices in teamwork by project owners, architects, engineers, constructors, and trades. Each year, CBC recognizes projects whose team members have met or surpassed goals and achieved higher project quality through this close collaboration. The Connecticut Building Congress honored project teams that showed extraordinary collaboration in the execution of their projects.

SLAM received first place awards in the “Small Projects” category for the “Kent School Music and Mattison Auditorium”, a design-build project with S/L/A/M Construction Services, and in the “New Construction” category for the “Bedford Family Center” with Turner Construction. The Bedford Family Center, a new YMCA facility located in Westport, CT was also recognized as the CBC “Project of the Year”.

“It was an honor to have worked on each of these high-caliber teams”, Robert F. Pulito, AIA, SLAM President said. “Several of these projects have been honored by other groups as well, illustrating how much teamwork matters in project delivery.”

SLAM was also recognized for winning “Awards of Merit” for Danbury Hospital’s Peter and Lucia Buck Pavilion with Gilbane Building Company, “Middlesex Hospital Shoreline Medical Center” with the Whiting-Turner Contracting Company, and for “Harvard H. Ellis High School” with KBE Building Company.

For more information about The S/L/A/M Collaborative, please visit www.slamcoll.com or call 860-657-8077.

Featured

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Georgia State University Opens New Research Tower

    Georgia State University in Atlanta, Ga., recently held a ribbon-cutting ceremony for a new, nine-story, 155,000-square-foot Research Tower, according to university news. Amenities include academic classrooms, a large lecture space, teaching labs, faculty research space, and the uppermost floors reserved for future expansion.