Ramtech Completes Installation of Modular Buildings at Tornado Damaged Van ISD

Ramtech has completed the work on four new modular buildings placed at the site of the temporary school campus established by the Van (TX) Independent School District in the wake of the damage incurred from the tornado that went through the city on May 10. The modular school buildings were configured as portable restrooms, and will be used by the district’s second and third grade students who will be relocated from the damaged J.E Rhodes elementary school to the temporary school site at the front section of property at Van Middle School. Working together with Eubanks Harris Roberts Craig Architects, each one of the 12′X 34′buildings were designed to include boys and girls restrooms with age-appropriate child height toilets.

Purchased through the Texas Association of School Board’s Buyboard purchasing co-op, the buildings have standard R-panel siding on the exterior and fiberglass reinforced plastic panels on the interior walls. Ramtech’s scope of work also included the installation of the decks, ramps, and landings. The EF3 tornado caused over $40 million in damage which included two of Van ISD’s schools, the administration building, and the maintenance and transportation centers. To be able to start school on time in August, the district received portable classroom buildings that were donated from the Tyler Independent School District. Tyler ISD’s current superintendent is Dr. Marty Crawford, who in 2013, led the West Independent School District through their rebuilding effort after the devastating fertilizer plant explosion in the city of West.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.