Ramtech Completes Installation of Modular Buildings at Tornado Damaged Van ISD

Ramtech has completed the work on four new modular buildings placed at the site of the temporary school campus established by the Van (TX) Independent School District in the wake of the damage incurred from the tornado that went through the city on May 10. The modular school buildings were configured as portable restrooms, and will be used by the district’s second and third grade students who will be relocated from the damaged J.E Rhodes elementary school to the temporary school site at the front section of property at Van Middle School. Working together with Eubanks Harris Roberts Craig Architects, each one of the 12′X 34′buildings were designed to include boys and girls restrooms with age-appropriate child height toilets.

Purchased through the Texas Association of School Board’s Buyboard purchasing co-op, the buildings have standard R-panel siding on the exterior and fiberglass reinforced plastic panels on the interior walls. Ramtech’s scope of work also included the installation of the decks, ramps, and landings. The EF3 tornado caused over $40 million in damage which included two of Van ISD’s schools, the administration building, and the maintenance and transportation centers. To be able to start school on time in August, the district received portable classroom buildings that were donated from the Tyler Independent School District. Tyler ISD’s current superintendent is Dr. Marty Crawford, who in 2013, led the West Independent School District through their rebuilding effort after the devastating fertilizer plant explosion in the city of West.

Featured

  • Wold Architects & Engineers Announces Acquisition of JJCA

    Wold Architects & Engineers, based in Minneapolis, Minn., recently announced that it has acquired JJCA, an architecture firm based in Nashville, Tenn., according to a press release. JJCA specializes in healthcare and education design; the partnership allows both firms to expand their presence across the country while building on existing strengths.

  • Fargo, N.D., Starts Construction on Consolidated Elementary School

    Fargo Public Schools in Fargo, N.D., recently announced the beginning of construction on a new elementary school, according to a news release. The district partnered with ICON Architectural Group and Kraus-Anderson Construction on the new Horace Mann Elementary School.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.