A.G. Bell Elementary School

Lake Washington School District, Kirkland, Wash.

A.G. Bell Elementary SchoolWith an existing forest and wetland, significant slopes and a sprawling campus, the replacement of A.G. Bell Elementary posed challenging natural and built constraints. DLR Group’s design brings restoration to the fractured site by integrating its unique qualities in a school enabled to meet educational goals, sustainably reduce the cost of ownership and reinforce community connections. Featuring roof canopies and staggered elevations, the building complements nearby vegetation and maximizes daylight through sunshades, light-diffusing glass and deliberate orientation, reinforcing transparent learning environments.

The surrounding forest was left intact, requiring diligent phasing of the occupied site and integration of walking paths to surrounding neighborhoods. Based on two primary circulation axes, A.G. Bell Elementary offers ease of circulation, equal access to shared learning spaces and pays homage to the former school through the reuse of salvaged cedar wood covering the library (seen prominently from the entryway and lobby). With a clear, welcoming entry and adequate space designed for community and school use, A.G. Bell Elementary is now enabled to serve both its students and community.

A.G. Bell Elementary SchoolARCHITECT

DLR Group
NOAH GREENBERG
206.461.6000

PROJECT INFORMATION

CHIEF ADMINISTRATOR
Forrest Miller

COMPLETION DATE
September 2013

GROSS AREA
65,306 sq. ft.

PER STUDENT
119 sq. ft.

SITE SIZE
9 acres

CURRENT ENROLLMENT
N/A

CAPACITY
550 students

COST PER STUDENT
$36,363

COST PER SQ. FT.
$306

TOTAL COST
N/A

COMPANY PROFILE

Founded in Omaha in 1966, DLR Group has grown to 22 offices across the U.S., Shanghai, and Dubai and over 600 employees combining international experience with local expertise. As an integrated design firm, we provide architecture, design, engineering and planning.

This article originally appeared in the issue of .

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition