Evacuate Quickly and Safely in Any Situation

EVAC+CHAIR

EVAC+CHAIR makes it possible for everyone to evacuate quickly and safely in an emergency, making them key to Cal. State University Long Beach’s emergency preparedness plans.

Evacuate Quickly and Safely in Any Situation CONTINUING to improve campus safety in case of an emergency, EVAC+CHAIR Evacuation Chairs have been installed in every multiple-story building at California State University Long Beach to provide those with access needs — such as those who are wheelchair bound or have been injured — a safe means of evacuation during an emergency.

EVAC+CHAIRs — 120 of them are located strategically across campus — are marked with a bright yellow cover and a photo-luminescent sign above them. The chairs fold up, allowing them to be easily transferred to the individual in need, hang on the wall and are lightweight, weighing only 19 pounds.

The EVAC+CHAIR is a universal evacuation solution for smooth stairway descent, without the need of great physical strength or lifting. The device will assist staff, students and visitors with temporary or permanent mobility impairment. It is lightweight and easy to use allowing wheelchair users or less able-bodied people to be evacuated quickly and safely down stairs in the event of an emergency.

Cal. State University Long Beach has encouraged staff and students with a mobility impairment to make themselves known, to ensure they are given high priority should the worst happen and an EVAC+CHAIR need to be used.

Regular fire drills and practice training are also part of the plan in an effort to improve safety and to safeguard the smooth operation of procedures. “In the event of an earthquake or a fire, you’re not allowed to use the elevators so those with access and functional needs, persons with disabilities, or those who have been injured above the first floor won’t readily be able to get downstairs to ground level,” says John Rosene, emergency management and preparedness coordinator at the university. “So in an effort to be ahead of the curve, institutions are moving towards this.”

www.evac-chair.com

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.