Advantages of Seamless Floors

When choosing floor materials, planners should consider the big picture. There are endless options in colors and styles in most every category of flooring, but finding a floor that meshes with overall design, meets all the performance standards and promises to be easy to clean can be challenge. Planners should look at seamless, resinous hard-surface floors, such as epoxy and urethane poured floors. These “hard” surfaces can still be resilient, but seamless is the key. Seams and grout lines, found in vinyl or other types of tile systems, collect dirt. Dirt invites bacteria. This is not only a maintenance problem, but also a health issue.

Planners may wonder if seamless surfaces will work for every area in a facility. They can work just about everywhere, from kitchens to locker rooms to corridors and classrooms. The design elements many seamless floor companies offer provide tremendous design flexibility: you can incorporate shapes, designs and custom colors to define a space without sacrificing performance characteristics (stain, abrasion and impact resistance) and ease of cleaning.

A multipurpose room, for example, might be changed over eight times in one day: from meeting room to cafeteria to student assembly area to gym. The floor stays the same, but the uses vary and everyone’s needs are accommodated. More importantly, the maintenance staff can move in and out of the room quickly to ready the floor and the room for the next function. A seamless, resilient system meets all these needs, plus keeps noise down and is easy underfoot.

In addition, seamless, non-wax surfaces — available in epoxy and urethane poured-in-place floors — speak loudly to sustainability, and a nonwax surface will result in lower life-cycle costs. Also, the use of urethane-based seamless systems provides increased chemical and stain resistance, particularly in laboratory applications.

This article originally appeared in the issue of .

About the Author

Kendall Speer Ellis is the Marketing manager for The Stonhard Group. She can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.