Houghton College: Kerr-Pegula Athletic Complex

Houghton College: Kerr-Pegula Athletic Complex

PHOTOS COURTESY OF KEYSTONE ASSOCIATES

The Kerr-Pegula Athletic Complex at Houghton College completed its third and final phase of its $23-million project in November 2014 with the completion of the Kerr-Pegula Field House. Located in western New York State, Houghton College provides an academically challenging, Christ-centered education in the liberal arts and sciences and equips students to lead and labor as scholar-servants.

The Kerr-Pegula Athletic Complex was made possible, in part, by an initial $12 million gift given to Houghton College in November 2011 by Houghton alumna Kim (Kerr ’91) Pegula and her husband Terry Pegula, owners of the Buffalo Bills, Buffalo Sabres and Rochester Americans hockey teams.

Phase I saw the resurfacing of Burke Field (a multi-sport competition field) and Phase II included the construction of separate baseball and softball stadiums. The third and final phase was the completion of the 115,000-square-foot field house. As Houghton College transitions into NCAA Division III and the Empire 8 Athletic Conference, the facility provides a practice and competition venue for the tennis and track-and-field programs, while offering indoor practice space for outdoor sports over the winter and during inclement weather.

Designed by Keystone Associates, Architects, Engineers and Surveyors, L.L.C. of Binghamton, NY, the field house features an eight lane, 200-meter regulation-size track; six tennis courts; cardio fitness center; weightlifting room; MVP conference room; commercial kitchen and concessions; locker-room facilities and office space. The facility also provides expanded opportunities for the college’s highly popular intramurals program.

The facility serves as an anchor for the separate Burke Field, baseball and softball stadiums. The field house also provides a venue for non-athletic uses for both the college and the surrounding area with the ability to host major events for 6,000 occupants in the main field house area.

This article originally appeared in the issue of .

Featured

  • Michigan School District Installs New Gun-Detection Platform

    Williamston Community Schools in Williamston, Mich., recently announced that it has installed the ZeroEyes gun-detection video analytics platform for its five schools, according to a news release. ZeroEyes is the only solution of its kind with a U.S. Department of Homeland Security SAFETY Act Designation and adds an AI gun-detection and intelligent situational awareness software layer into existing school security cameras.

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • Cedar Crest College to Build Criminal Justice Facility

    Cedar Crest College recently announced it will create a new Expert Witness Training Center and Crime Scene Lab for its campus in Allentown, Pa., according to a news release. The college is one of eight in the country to have earned Forensic Science Educational Programs Accreditation Commission (FEPAC) accreditation for its undergraduate and graduate programs.

  • Studio G Announces Completion of New Massachusetts Elementary School

    The Groton-Dunstable Regional School District in Groton, Mass., recently announced the completion of a new elementary school, according to a news release. Florence Roche Elementary School measures in at 110,000 square feet and has the capacity for 645 students in grades K–4.