Point Loma Nazarene University: Sator Hall and Latter Hall

Point Loma Nazarene University: Sator Hall and Latter Hall

PHOTOS ON THE LEFT © MARCUS EMERSON | PHOTOS ON THE RIGHT AND BELOW © CARRIER JOHNSON + CULTURE

Point Loma Nazarene University (PLNU) in San Diego, CA, is home to a new 36,000-squarefoot science center. The innovative design by Carrier Johnson + CULTURE, marked by a curving environmental screen and its prominent coastal site, becomes a memorable home for the university’s rapidly growing and acclaimed interdisciplinary science program, unifying modern Christian values with a broad curriculum and state-of-theart technology, laboratories and classrooms.

Known as Sator Hall and Latter Hall, the science complex is significant both architecturally and academically.

The project team designed the new facility to connect to the existing Rohr Science building in a future phase. The completed science complex is relatively simple: Two walls and a roof of concrete frame a cube of crystalline glass. Subtly consecrating its Christian foundations in a salient design feature, a long arc of a perforated metal wall spans the length the new building. The vertical panels protect the floor-to-ceiling glass classrooms and labs from the southerly sun’s glare and heat. Illuminated from behind at night, the wall radiates the light of scientific inquiry and discovery.

In between the new and old science centers is an outdoor classroom, ideal for reliably temperate San Diego. Below the four classrooms are 13 advanced labs for biology, chemistry and anatomy, serving PLNU’s mission to spark scientific discovery and the spirit of service.

Initial feedback from students and faculty has been overwhelmingly positive. Since the 1970s, the university has been planning a major science center, and in the intervening time has earned a strong national reputation for science and STEM education. Since 2004, over 90 percent of PLNU students applying for admission to medical, dental, optometry, pharmacy and veterinary schools have been admitted. Recently it earned six-figure grant from the National Science Foundation (NSF) to fund undergraduate scholarships in STEM disciplines for students with minors in computational science.

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.