Dedicated Outdoor Air Systems (DOAS)

An estimated 70 percent of all school buildings have indoor air quality (IAQ) problems, leading to an unhealthy environment. Many common IAQ problems are associated with improperly operated and maintained HVAC systems, overcrowding, moisture incursion and dampness, and presence of outside air pollutants. IAQ problems have a greater impact on children than adults, as children breathe a greater volume of air relative to their body weight.

Additionally, occupants of school buildings are close together, with approximately four times the occupant density in schools compared to office buildings. Mounting evidence indicates that the quality of a school’s physical environment affects educational achievement and more attention is now being paid to addressing IAQ issues.

With this in mind, the installation of a DOAS system can dramatically improve indoor air quality, creating a happier, healthier and more productive environment for students, teachers and staff, and some systems assist in earning valuable LEED points. DOAS systems condition up to 100 percent of outdoor air — improving air quality, and reducing the load on other HVAC equipment in a building. This reduction in HVAC equipment load can result in significant savings in energy consumption over the lifetime of a system.

Humidity control is another great benefit of these systems. Human occupants and certain equipment in a school will generate moisture, but most moisture comes from the ambient conditions. If an uncontrolled amount of moisture is continually added to a building, a mold-friendly environment will result. Even if mold is not a concern, the moisture content in the air will affect the comfort level for occupants. These and other benefits make DOAS systems the perfect choice for school buildings.

This article originally appeared in the issue of .

About the Author

Kevin Miskewicz is the director of Commercial Marketing with Mitsubishi Electric Cooling & Heating. He can be reached at [email protected] or 888/979-9686.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.