An Upgrade at Virginia Tech

auditorium McBryde upgradeMcBryde 100 auditorium, a 550-seat raked floor auditorium, is the largest classroom assembly space on the main campus of Virginia Polytechnic and State University (Virginia Tech) in Blacksburg. Heavily used by multiple departments for large format “101” classes, the instruction space, like many similar auditoriums built in the 1970s, was in need of updates and improvements. Designed and executed by the Washington, DC, studio of Westlake Reed Leskosky, the interior renovation addressed accessibility compliance, life safety issues, aging infrastructure, aging technology and worn interior finishes and furnishings.

With one strategic sectional change, Westlake Reed Leskosky solved a variety of accessibility compliance issues, accommodates instructor circulation within the room, and provides for future evolutions in teaching pedagogy. The key renovation design concept of a modified floor slab improves accessibility throughout the space and facilitates more integrated teaching methods for instructors and students. Specifically, the strategy involved changing the rake of the floor to 1:12, adding continuous rails at side aisles, introducing an intermediate aisle, and interspersing ADAcompliant seating spaces throughout the room, while sacrificing only a minimal number of seats from the previous condition.

auditorium McBryde upgradeModern teaching systems via the podium, AV systems projecting on a fixed surface, new seating systems, interior finishes, lighting and acoustical treatments make the auditorium one of the most elegant large-scale teaching environments on campus. The interiors feature new maple wall and ceiling paneling, highly sustainable fabric-wrapped panels, and other finishes inspired by the existing Hokie Stone walls that are prominent throughout campus.

This article originally appeared in the issue of .

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • USC Launches Major AI Initiative After $200M Gift

    The University of Southern California in Los Angeles, Calif., recently announced that it has launched a “transformational” new AI initiative thanks to a $200M gift, according to a news release. The project will leverage AI toward breakthroughs and innovations in subjects like the health sciences, business, security, and the arts.