I Can Hear Clearly Now

Hear Clearly

PHOTO © D13

While kids frequently leave you with the impression that they don’t notice anything that isn’t on their smart phone or screeching at them from a television set, that isn’t necessarily so. Sometimes even seemingly subtle changes can produce profound differences and, ultimately, recognition from usually oblivious youth.

Take a roomful of sixth graders at the Robert E. Lamberton Public School in Philadelphia. Dr. Kenneth Roy, senior principal research scientist at Armstrong Ceiling Systems, conducted a test at the school involving the acoustics in that sixth grade classroom. The class was videotaped; however, the teacher was the only one in the room told the reason for doing so.

Prior to making any changes in the room, Dr. Roy took sound measurements in the classroom. The existing classroom ceiling consisted of one-half inch thickness of fiberglass insulation sprayed over plaster. The reverberation rate of sound in the room, he discovered, was up to 1.3 seconds, far exceeding classroom acoustic (ANSI S12.60) standards. The sound was, quite literally, bouncing off the ceiling and walls.

Taking advantage of a long weekend, Armstrong installed a suspended acoustic panel ceiling in the classroom. New ceilings also were installed in the school’s cafeteria and the principal’s office.

When the sixth grade students returned to class, new sound measurements were taken. This time, the classroom met the ANSI standard for sound reverberation of 0.60 seconds.

The teacher indicated there appeared to be less fidgeting and talking during lessons. Her students seemed to be paying more attention. What was even more interesting was the reaction of the students. When asked if they’d noticed any changes, there was an immediate response — they noticed the improvement in the sound levels. Several also commented that the room was a lot brighter, and yet another student, who sat in the back of the room, said “I can hear (my teacher) a lot better today.”

This article originally appeared in the issue of .

Featured

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.