Why should we use orbital scrubbers?

Education facility managers and administrators struggle to balance limited operational budgets and a need to maintain clean and healthy schools for their students and faculty.

Subject to continuous foot traffic, floors become soiled quickly and that dirt is tracked throughout buildings. Soiled floors not only detract from the overall aesthetics of facilities, but slick dirt and grime can cause slip-and-fall hazards while dust and allergens adversely impact indoor air quality (IAQ). Numerous studies have identified poor IAQ as a key contributor to the development of asthma in young people and the spread of other illnesses among students and faculty. These illnesses lead to increased absenteeism, which is directly linked to poorer classroom performance.

Orbital scrubbers allow maintenance teams to maintain a high level of cleanliness with minimal chemical and water usage. By actively removing dirt and grime, as well as the chemical residue that attracts dirt, orbital scrubbers help maintenance staff to keep schools healthier. The introduction of orbital scrubbers has allowed schools to maximize operational resources and enhance the learning environment while continuing to achieve a high level of appearance that meets the expectations of students and staff.

While orbital scrubbers achieve a high level of performance for daily scrubbing, they also offer the flexibility to be used for deep scrubbing and chemical-free floor finish removal. Traditionally, the deep scrub and recoat process required many hours of labor, multiple machines and harsh chemicals. Orbital scrubbers allow this operation to be performed with water only — no chemicals — helping schools to enjoy significant budget savings while introducing fewer chemicals into their facilities.

This article originally appeared in the issue of .

About the Author

Scott Keller is a market manager for Nilfisk, Inc. (www.advance-us.com, www.clarkeus.com). He can be reached at 763/745-3824.

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Countway Library at Harvard Medical School

    From Shadows to Sanctuary: The Transformation of Light at Countway Library

    The renovation of Countway Library at Harvard Medical School demonstrates how biophilic design and advanced lighting strategies transformed a formerly dark, insular space into a vibrant, welcoming hub that supports wellness, learning, and community engagement.

Digital Edition