BioFit Solution Extends Life of Mobile Folding Cafeteria Tables

Mobile Folding Cafeteria Tables

BioFit’s adjustable torsion cap keeps older tables folding and unfolding like the day they left the factory at Monrovia Elementary School.

Monrovia Elementary School in Huntsville, Ala., uses 27 BioFit 12-seat mobile folding tables in its cafeteria. As the 13-year warranty period for the tables was coming to an end, facilities manager Wayne Slater noticed the tables were becoming more difficult to fold and unfolded more quickly than they once had. Since the tables were in excellent shape otherwise, he contacted BioFit for help.

We informed Mr. Slater of a new, patent-pending component developed by BioFit to keep older tables folding and unfolding like the day they left the factory: the adjustable torsion cap. Regardless of the manufacturer, mobile folding tables use a lift-assist mechanism to facilitate safe and easy folding. Over time, these mechanisms lose torque, meaning it takes more force to fold a table and to keep it from unfolding too rapidly. Adjusting the torque level to original specifications alleviates this problem.

BioFit provided the caps needed to retrofit the Monrovia Elementary tables. Installation was fast, easy and effective. Afterward, Mr. Slater shared: “Since installing the adjustable torsion caps, I can close the tables with one hand. They work like new.”

Available on all new BioFit tables, the adjustable torsion cap eliminates an age-old issue with table lift-assistance devices. By enabling the re-establishment of the factory-specified lift capability, it facilitates safe operation through the life cycle of the product and allows customers to save money by avoiding costly repairs or delaying the need to replace failing tables. Additionally, due to the relative ease of retrofitting, the cap provides an economical way to refresh the lift on older tables in the field.

The adjustable torsion cap is another example of our mission to consistently improve the learning environment.

www.biofit.com

This article originally appeared in the issue of .

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition