ESCOS: Potential Funding Source for Sustainable Schools

“How can we pay for the energy efficiency improvements?” The answer is funding, which can come from a variety of sources — internal funds, bonding, debt financing, lease or lease-purchase agreements, energy performance contracts, utility incentives and government grants, to name a few. For many schools funding remains the roadblock to implementing energy efficient technologies, and internal funding is not an option.

Leasing or debt financing may provide a workable alternative. In both cases the high up-front costs can be reduced or avoided, and costs can be repaid through the savings that accrue. Another method is perfomance contracts provided by ESCO’s (Energy Service Companies). Typically the ESCO provides a service package that includes the design and engineering, financing, installation and maintenance of the retrofit. Most importantly, ESCO’s provide a guarantee of the energy savings. Schools should also take advantage of the incentives offered by utility companies for the installation of energy efficient equipment. These offers range from equipment rebates, to design assistance, to low-interest loans.

Along with the corporate world, many states have also stepped up to the plate when it comes to financing energy efficient schools. Some states are providing low-interest loans for conservation and renewable resource projects. Others provide state energy tax credits to eligible projects. Also, don’t overlook the many federal agencies offer grants or make financing available to schools for projects that affect energy efficiency. The money is available, the key is finding it.

The most important thing to remember is that being energy efficient does not necessarily translate into significant expenses. When designing new buildings the construction cost trade-offs often allow the architects to incorporate energy-efficient technologies without an increase in cost. When operating existing buildings insulate and weatherstrip, repair cracked windows, close outside doors behind you, plant trees or large shrubs to act as windbreaks or for shade, install low water-use fixture, automate building controls and turn off the lights!

This article originally appeared in the issue of .

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition