What's in the Adobe Studio?

  • Adobe Digital StudioThe Studio introduces itself by cantilevering through a new 16- by 32-foot opening in the existing lobby’s east wall and is visible from the entrance below.
  • A stainless-steel-clad Help Desk varies from standing- to seating- to wheelchair-height to accommodate various seating configurations and interactions. Power and data ports allow ad hoc work teams to “plug in” anywhere — and include drains for spilled coffee.
  • A Video Production Studio includes a horizon-less green screen, which simplifies replacement of backgrounds in live video, and sound-absorptive wall panels to minimize sound flutter.
  • An Audio Production Studio houses audio recording and editing equipment.
  • Seating varies, from stools to chairs and modular “living room” groups to on-floor lounge chairs. All are portable.
  • Technical provisions allow collaborators to share live screen images from multiple computers within the group or on public screens within the Studio.
  • The “Behance Wall,” a cluster of wallmounted monitors — one of only three in the country and the only one outside of Adobe’s headquarters — streams projects based on criteria entered by touchscreen within the Studio.
  • Three-inch-high access flooring throughout allows access to and easy reconfiguration of data and power wiring as the future placement and technology evolves.

This article originally appeared in the issue of .

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition