Simplify Maintenance with Rubber Flooring

Maintaining floor coverings throughout educational facilities can be challenging. Floors in these buildings are subject to a variety of uses. Foot traffic is significant and opportunities for staining numerous. Rubber flooring offers a solution that simplifies maintenance. Here’s why:

  • Rubber flooring is a sustainable material made from natural and synthetic rubber. The floor’s dense, homogeneous surface repels dirt while resisting staining. As a result, the floor stays clean longer and can be maintained with little more than water.
  • The dense surface does not absorb water, chemicals and other liquid spills, which makes for easy cleanup, while minimizing the potential for slips.
  • Rubber flooring never requires waxing, labor-intensive stripping or the application of sealants, saving valuable time and the costs of purchasing wax and sealants.
  • Maintenance is far less intrusive, because groups of students do not need to be moved from areas for extended periods of time while floors are cleaned and waxes are stripped, re-applied and allowed to dry.
  • Scheduling maintenance is easier because large areas do not need to be closed for lengthy periods of time. For the same reason, maintenance is not restricted to holiday and summer breaks.
  • The resiliency of rubber flooring makes it easier to move equipment and furniture. It also ensures the comfort of housekeeping staff, protecting against muscle fatigue and aching backs, legs and feet.

In addition to these maintenance benefits, rubber flooring offers a variety of performance features and the durability that make it an attractive long-term investment for schools.

This article originally appeared in the issue of .

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at Tasha.hughes@nora.com or 800-332/NORA.

Featured

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.