Better Classroom Security for Safer Schools

CLassroom Security

Olathe Public School District made their schools safer and more secure by replacing multiple brands of locks on classroom doors with Schlage locks and the Everest 29 key system.

The Olathe Public School District in Kansas is improving classroom security and simplifying key control by replacing multiple brands of locks on classrooms doors with Schlage locks and the patent-protected Everest 29™ key system.

With 40+ schools, the school district was using key systems from three different manufacturers, making key control difficult.

Challenges included:

  • Limited support and expansion: manufacturers no longer supported some systems, while others had reached their capacity.
  • Overexposure: Some of the key systems had been in place so long that it was difficult or impossible to know who had keys.
  • Maintenance: Upkeep was also troublesome with so many key systems to maintain.

The district wanted to implement door hardware products and a consistent key system across the district that allowed for increased control and more effective maintenance.

The school district chose Schlage mortise and cylindrical lock products and a patent-protected Everest 29 key system because of its many benefits, including:

  • Patent protection: The key system provides patent protection against unauthorized duplication through 2029, so the district will be able to maintain effective key control with confidence.
  • Ease of rekeying: All locks are Schlage with full-size interchangeable cores, which simplify rekeying.
  • Classroom security functionality: The Schlage L-Series mortise locks and ND-Series cylindrical locks used include a classroom function that allows teachers to lock the door from within the classroom during an incident.

Most of the locks being upgraded are on classroom doors, the district also is replacing locks on other openings.

www.allegion.com

This article originally appeared in the issue of .

Featured

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.