Easy Access Control Solution

access control

Better security and the need for fewer keys were two of the many benefits RJUSD experienced when implementing their Cyberlock System.

Due to regularly lost keys and vandalism of property, Roseville Joint Unified School District’s (RJUSD) Brian Gruchow (director of operations) needed to implement a district-wide access control solution. With an ever-growing number of keys getting lost or stolen each year, it was financially prohibitive to rekey the entire district. A complete rekey had not occurred in over 30 years, causing a lack of security throughout the district.

After a year of in-depth research about various security products, the RJUSD discovered the solution that best fit their needs. Inexpensive, ease of installation and minimal maintenance requirements made CyberLock’s access control system the best fit. CyberLock required no hardwiring and the cylinders were easily retrofitted in the district’s existing hardware. The ease of installation was an immediate benefit in both cost of equipment and labor.

RJUSD has benefitted immensely from the CyberLock system. The CyberLock system allows keyholders to carry one key to access various locks, which has significantly decreased the overall number of keys they use. Additionally, they will never need to rekey the entire district again. CyberLock allows the district to schedule access permissions to specific locks and prohibit access to other locks through the CyberAudit software.

The software also allows lost or stolen keys to be labeled as such, therefore prohibiting their access permissions. District management also has the ability to pull an audit trail that shows which key attempted to access specific locks and the time the attempt occurred. RJUSD also found that the CyberLock system did not impede daily operations and it was easy to use.

Gruchow states, “Better security for our kids is the number one priority”. With over 10,000 students across several campuses, district security has increased significantly due to CyberLock.

www.cyberlock.com

This article originally appeared in the issue of .

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition