Putnam High School Renovation Complete

Putnam High SchoolTorrington, Conn. –  Putnam High School in Putnam, Conn., recently completed a $36.6-million, 98,000-square-foot, renovate-as-new project that began in the fall of 2014.  The scope of the project included replacing windows, renovating science labs, expanding the gymnasium, transforming the existing library into a multi-media center and upgrading the mechanical infrastructure of the 60-year-old building.

“During the course of this project we performed a comprehensive renovation that upgraded the school’s facilities to that of a modern educational environment.  In the areas that were touched by the renovation we removed all of the structure down to the outer shell of the building.  Then we reconstructed the facility with all new components” said Ken Biega, assistant vice president of O&G Industries.  “We will also address challenges such as the lack of natural light, bring outdated systems up to code, incorporate energy efficient design features and expand areas such as the gymnasium that no longer meet the school’s needs.”

The project team included construction manager O&G Industries of Torrington, Connecticut and project architect Drummey Rosane Anderson (DRA Architects) of South Windsor, Connecticut.

About O&G Industries, Inc.
O&G is Connecticut’s largest privately-held construction company, one of the country’s Top 400 Contractors and a Top 100 Green Building Contractor.  Visit www.ogind.com.

About Drummey Rosane Anderson (DRA Architects)
DRA is a thriving firm of 30 architects, planners, interior designers and construction administrators.  We specialize in educational, municipal, recreational, and institutional design. Visit www.draarchitects.com.

Featured

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.