Historic Tavern Being Converted into Classrooms, Offices

RiverbendSouth Natick, Mass. – Nauset Construction recently began work on a project that will transform an 18th-century tavern into a new facility used by the middle school on the campus of the Riverbend School in Natick. Located at 33 Eliot Street, the completed project will provide new classroom, office and multi-purpose space for Riverbend’s expanding campus.

Designed by Piatt Associates, the project includes the conversion of the Peletiah Morse Tavern, which was built in 1748 to serve as a residence, tavern and stage stop for travelers on the Old Hartford Road, as well as the construction of a two-story, 4,200 square foot addition. The existing addition to the tavern (circa 1901) was demolished to make way for the new building. When completed, the new facilities will house science and math classrooms for middle schoolers, a large multi-purpose space for music instruction, a Welcome Center for prospective Riverbend School families, and administrative offices. 

In order to retain the historic character of the tavern, historically accurate replica windows and a hand hewn front door will be installed, and the wood siding, trim, and masonry will reflect the style of the original buildings. The tavern’s first floor will be lowered for added ceiling height, a second-floor ceiling will be exposed to reveal the original beams, and a faux chimney will be re-built in the tavern using the bricks from an original, which had previously been demolished. In addition, the entire MEP and fire protection systems in the tavern will be replaced.

The project is not without challenges, as the school will remain open during the entire construction process, including the remaining summer months. “Working on a highly sensitive, fully operational school campus requires strict adherence to the safety procedures that we have developed and honed through our extensive work with both occupied school and medical facilities,” said Nauset president Anthony Papantonis.

The project is anticipated to be completed by mid-December.

For more information, visit  piattarchitecture.com/ or  www.nauset.com.

Featured

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.